Busan Noksan Sewage Treatment Plant
780 t/d(Sludge 578 t/d, Food Wastewater 200 t/d)
Influent TN 1,249 mg/L, Nitrogen Removal Rate 84.6%
Hydraulic Retention Time(HRT) 2.1d, Nitrogen Loading Rate(NLR) 0.6 kgN/㎥/d
AMX
Daejeon Sewage Treatment Plant Modernization Project (under design)
Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)
Methane production rate: 0.25 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 55.0% (design)
Draco, AAD, AMX
Daejeon STP(AMX Mass Cultivation Tank)
600㎥/d(Sewage sludge digestate)
Influent TN 650 mg/L, Nitrogen Removal Rate 82%
Hydraulic Retention Time(HRT) 0.4d, Nitrogen Loading Rate(NLR) 1.8 kgN/㎥/d
Digestate, side-stream AMX
Hyperion Water Reclamation Plant, USA
Sewage Main-stream reference(40㎥/d)
main-stream AMX, Mainstream AMX
Samsung Electronics Industrial Wastewater Treatment
Industrail wastewater treatment
High-load Nitrogen wastewater treatment AMX
Daewon Agricultural Products Bio-gas Plant Project(Goesan County)
280 t/d(Food waste digestate)
Influent TN 2,036 mg/L, Nitrogen Removal Rate 84.3%
Hydaulic Retention Time(HRT) 3.8d, Nitrogen Load Rate(NLR)0.53 kgN/㎥/d
Digestate, side-stream AMX
Daejeon Sanitary Landfill
30t/d(Landfill Leachate)
Influent TN 1,515 mg/L, Nitrogen Removal Rate 87%
Hydraulic Retention Time(HRT) 2.2일, Nitrogen Loading Rate(NLR) 0.7 kgN/㎥/d
Leachate, side-stream AMX
Muan County Public Food Waste Treatment Plant Expansion Project
87 t/d(Food waste digestate)
Influent TN 1,557 mg/L, Nitrogen Removal Rate 81.4%
Hydraulic Retention Time(HRT) 2.8일, Nitrogen Loading Rate(NLR) 0.6 kgN/㎥/d
Digestate, side-stream AMX
GS Caltex Yeosu City Wastewater Treatment Plant No.2 New Thickening Process Project
Industrial Wastewater
Capacity: 600㎥/d
Process: vDAF
Dangjin City Livestock Wastewater Treatment Plant Advanced Treatment Facility Project
7.0㎥/hr
vDAF
Wastewater Advanced Treatment(Tertiary)
Boeun County Livestock Wastewater Treatment Plant Advanced Treatment Facility Project
5.0㎥/hr
vDAF
Wastewater Advanced Treatment(Tertiary)
Boeun County Livestock Wastewater Treatment Plant Project
80㎥/d
BCS, FMX, vDAF, Proteus NDN
Livestock wastewater treatment, resource recovery, O&M
Sungju County Sewage and Livestock Wastewater Treatment Plant Project
80㎥/d
BCS, vDAF
Livestock wastewater treatment, resource recovery, O&M
Seoul Seonam Water Resource Recovery Facility
720,000㎥/d
BBF-F, Proteus, BBF, PROTEUS
Wet Weather Flow
Seoul Jungnang Water Resource Recovery Facility
250,000㎥/d
Proteus N, Proteus NDN, Proteus, BBF
Sewage treatment, primary treatment, wet weather flow
The Anthony Ragnone Treatment Plant (ARTP) in Genesee County
World first test for organic matter removal in wet weather flow
Proteus, Proteus+
Wet weather flow
Tancheon Water Resource Recovery Facility
Wet weather flow pilot capacity : 100 m3/d
Proteus, Proteus+
Wet weather flow