Busan Noksan Sewage Treatment Plant
780 t/d(Sludge 578 t/d, Food Wastewater 200 t/d)
Influent TN 1,249 mg/L, Nitrogen Removal Rate 84.6%
Hydraulic Retention Time(HRT) 2.1d, Nitrogen Loading Rate(NLR) 0.6 kgN/㎥/d
AMX
Daejeon Sewage Treatment Plant Modernization Project (under design)
Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)
Methane production rate: 0.25 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 55.0% (design)
Draco, AAD, AMX
Daewon Agricultural Products Bio-gas Plant Project(Goesan County)
280 t/d(Food waste digestate)
Influent TN 2,036 mg/L, Nitrogen Removal Rate 84.3%
Hydaulic Retention Time(HRT) 3.8d, Nitrogen Load Rate(NLR)0.53 kgN/㎥/d
Digestate, side-stream AMX
GS Caltex Yeosu City Wastewater Treatment Plant No.2 New Thickening Process Project
Industrial Wastewater
Capacity: 600㎥/d
Process: vDAF
Seoul Seonam Water Resource Recovery Facility
720,000㎥/d
BBF-F, Proteus, BBF, PROTEUS
Wet Weather Flow
Seoul Jungnang Water Resource Recovery Facility
250,000㎥/d
Proteus N, Proteus NDN, Proteus, BBF
Sewage treatment, primary treatment, wet weather flow
Qufu City(China) Sewage Treatment Plant
40,000㎥/d
Proteus NDN
Sewage advanced treatment(tertiary)
Miryang City Livestock Excrement Public Treatment Facility
Facility capacity: Total 100 ㎥/d (livestock manure 80 ㎥/d, food 20 ㎥/d)
Methane production rate: 0.40 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 70.0% (design)