Daegu City Organic waste resources integrated energy facility
Facility capacity: Total 20 tons/day (food 18 tons/day sewage sludge 2 tons/day)
Methane production rate: 0.51 Nm³ CH₄/kgVS (130% compared to design)
Organic matter removal rate: 86.8%
Facility capacity: Total 20 tons/day (food 18 tons/day sewage sludge 2 tons/day)
Methane production rate: 0.51 Nm³ CH₄/kgVS (130% compared to design)
Organic matter removal rate: 86.8%