Daejeon Sewage Treatment Plant Modernization Project (under design)
Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)
Methane production rate: 0.25 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 55.0% (design)
Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)
Methane production rate: 0.25 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 55.0% (design)