Sungju County Sewage and Livestock Wastewater Treatment Plant Project
80㎥/d
BCS, vDAF
Livestock wastewater treatment, resource recovery, O&M
Seoul Seonam Water Resource Recovery Facility
720,000㎥/d
BBF-F, Proteus, BBF, PROTEUS
Wet Weather Flow
Seoul Jungnang Water Resource Recovery Facility
250,000㎥/d
Proteus N, Proteus NDN, Proteus, BBF
Sewage treatment, primary treatment, wet weather flow
The Anthony Ragnone Treatment Plant (ARTP) in Genesee County
World first test for organic matter removal in wet weather flow
Proteus, Proteus+
Wet weather flow
Tancheon Water Resource Recovery Facility
Wet weather flow pilot capacity : 100 m3/d
Proteus, Proteus+
Wet weather flow
Gwangju City Yangbul Sewage Treatment Plant
20,000㎥/d
Proteus NDN
Sewage advanced treatment(tertiary)
Gwangju City Samli Sewage Treatment Plant
5,000㎥/d
Proteus NDN
Sewage advanced treatment(tertiary)
Qufu City(China) Sewage Treatment Plant
40,000㎥/d
Proteus NDN
Sewage advanced treatment(tertiary)
Seogwipo City West Livestock Wastewater Treatment Plant
200㎥/d
Proteus NDN
Livestock wastewater treatmen, O&M
Hwasung City Livestock Wastewater Treatment Plant
190t
BCS, FMX, vDAF, Proteus NDN
Livestock wastewater treatment, resource recovery, O&M
Dangjin City Livestock Wastewater Treatment Plant
95㎥/d
BCS, FMX, vDAF, Proteus NDN
Livestock wastewater treatment, resource recovery, O&M
Bukyung Slaughterhouse Waste Treatment Center
Facility capacity: Total 100 ㎥/d(Municipal sludge 50 tons/day, slaughterhouse waste 50 tons/day)
Input water content: 80.0%
Sludge volume reduction: 70%
Miryang City Livestock Excrement Public Treatment Facility
Facility capacity: Total 100 ㎥/d (livestock manure 80 ㎥/d, food 20 ㎥/d)
Methane production rate: 0.40 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 70.0% (design)
Daegu City Organic waste resources integrated energy facility
Facility capacity: Total 20 ㎥/d (food 18 ㎥/d sewage sludge 2 ㎥/d)
Methane production rate: 0.51 Nm³ CH₄/kgVS (130% compared to design)
Organic matter removal rate: 86.8%
Daejeon Sewage Treatment Plant Modernization Project (under design)
Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)
Methane production rate: 0.25 Nm³ CH₄/kgVS (design)
Organic matter removal rate: 55.0% (design)
Hongcheon Green Energy Town
Facility capacity: Total 100 tons/day (livestock manure 80 tons/day, food waste 20 tons/day)
Hwacheon Livestock Wastewater Treatment Plant
Capacity: 90t/d (Livestock wastewater 73t/d, Food waste 17t/d)
Methane generation : 0.38 N㎥CH₄/kgVS
Organics removal rate : 55.0%